AR Seismic Law
Board of Construction Appeal
Latest Codes Adopted
UDC Building Regulations
Backfill Material Notice
Building Wrap and Masonry Veneer
Covered Without Inspection
Existing Load Bearing Walls
Fayetteville Roofing Requirements
Gap Between Siding Veneers and Roofs
Inspection Priorities
Not Ready for an Inspection
OK to Cover
Rebar in Slab Spacing
Residential Entry Doors
Screen Porch Guards
Spray Applied Insulation
Substantial Alterations
Toilet Facilities
Trash Containment
Unventilated Attics
Arc-Fault Protection Required
Broken Seals on Swepco
Communication Equipment Meters
Electric Pedestals
Electric Pedestals with Broken Seals
Existing Meter - Lights Out
Main Disconnect Identification
Main Disconnect Location
Meter Approvals
PVC BD Conduit
Saw Service
UFER Ground Required
Underground Service Risers and Structures
Attic Access Opening Insulation
Attic Insulation Certificate and Markers
Attic Knee Wall Insulation
Slab Edge Insulation Methods
Auxiliary Condensation Drain and Pan
Clothes Dryer Ducts
Commercial HVAC during Construction
Load Calculations Required
Service Access for Mechanical Equipment
Frost Proof Hydrants
Gas Final and Service
Gas Inspection Banding Tape
HWH Pans
Main Water Service Valve
Plumbing and Gas State Approval