Question
Answer
Prior to obtaining a signatures for the Final Plat, the following items must be performed or provided to the satisfaction of the Engineering Division:
-
The work shown on the civil site package must be complete including the items on the final punch list
-
One (1) set of as-built drawings of the complete project (excluding details) plus an electronic copy in Tiff or PDF format
-
Unit price construction costs and a 2 year maintenance bond in the amount of 25% of the public improvements have been provided to the City
-
Certification that the streets, storm sewer, water, sewer lines, etc. were installed per approved plans and the City of Fayetteville requirements
-
Certification that the designed retaining walls were installed per approved plans and the City of Fayetteville requirements
-
Cross sections, volume calculations, and certification that the retention/detention ponds are in accordance with the approved drainage report
-
Surveyor’s Certification of Compliance
-
The As-Built Final Drainage Report as a hard copy and in PDF format