Staying Informed
AccessFayetteville provides numerous ways to stay informed about your local government.
Question
When is a grading permit needed?
Answer
A grading permit is required any time land disturbance activities are occurring, except for the following: excavation below finish grade for basements, footings, swimming pools and septic systems; cemetery graves; refuse disposal; single family homes or duplexes located outside the HHOD (Hillside/Hilltop Overlay District), areas of 15% slope or greater, or floodplain zones; and building additions of less than 2000 square feet.





Arabic
Italian
Chinese
Japanese
French
Korean
German
Spanish
Hindi
Vietnamese