The Cone Patrol

The Cone Patrol is a list of street and lane closures, along with traffic delays resulting from various construction projects and events. Projects are in alphabetical order by street name. Please be aware that these dates can vary depending on weather and other delays.

This list was updated September 6, 2013. 

Arkansas State Highway and Transportation Department project information is available at www.ArkansasHighways.com .

Street Construction Updates

Work Dates (Tentative) Project Completion Dates Street Location Descripton Notes
February 11, 2013 Early 2014 Garland Avenue (Hwy 112) (Between North Street and Janice Avenue)

In general, motorists should anticipate short delays due to the on-going construction work.

CONTACT: Arkansas State Highway & Transportation Department (479) 251-9266
April 7, 2014 Summer 2014 Halsell Rd (between Cross Ave and Sang Ave)

The City of Fayetteville Transportation Division will begin construction of a new sidewalk along the south side of Halsell Rd from Cross Ave to Sang Ave and continue along the west side of Sang Ave to Loren Cir.  Work is scheduled to begin Monday, April 7th and be completed in Summer 2014.  Along with the new sidewalk, other improvements include the installation of storm drain pipe, inlet boxes, curb and gutter.

Construction will require closing Halsell Rd (between Sang Ave to Cross Ave) and Sang Ave (between Cleveland St and Halsell Rd) to through traffic during work hours of 7:00am until 4:00pm, Monday through Friday.  Detour routes will be marked.  Local traffic will be allowed for residents during work hours.  Through traffic will be allowed during non-work hours.

CONTACT: Transportation Division 575-8228
December 1, 2012 Mid 2014 Highway 16 (15th St) between Armstrong Rd & Stone Bridge Rd In general, motorists should anticipate short delays due to the on-going construction work. CONTACT: Arkansas State Highway & Transportation Department, (479) 251-9266
June 2, 2014 August 2014 Leverett Ave (between North St and Cleveland St)

The City of Fayetteville Transportation Division will begin reconstruction of Leverett Avenue (between North Street and Cleveland Street) Monday, June 2nd.  The project is estimated to take 10 weeks.

The work will consist of storm drainage improvements, removing and replacing deteriorated sidewalks, curbing and street surface.  This will match the improvements made on Leverett Avenue (between Cleveland Street and Maple Street) in 2013.

Construction will require closing Leverett Avenue to through traffic from 7:00 am until 5:00 pm, Monday through Friday.  However, crews will utilize late night, early morning and weekend hours when needed.

Traffic will be detoured via Garland Avenue, the detour route will be marked.

CONTACT: Transportation Division (479) 575-8228
August 25, 2014 August 29, 2014 Maple St, east lane at the intersection of Mock At the intersection of N Mock and E Maple, only the east lane of Maple will be closed from August 25 - 29 to work on the waterlines. CONTACT: Nabholz Construction (479) 659-7868
8/14/14 8/15/14 N. Oakland Ave. (Between W. Douglas St. & W. Cleveland St.) 7:00 am - 3:00 pm, Retire Water & Sewer Service, No Emergency Traffic, Both lanes closed Contact Water & Sewer Department @ 575-8386
August 21, 2014 Unknown Randall Place entrance at HWY 265 The Randall Place entrance at HWY 265 will be closed begining August 21st and will remain closed until this project is complete due to safety concerns. CONTACT: Decco Contractors (479) 636-5516
8/18/14 8/19/14 Sligo & Ashwood, 18th & Ashwood, 18th & Beechwood 7:00 am - 3:00 pm, Repair sewer main, Both lanes, No emergency traffic Contact: Water & Sewer Department @ 575-8386
8/6/14 8/7/14 Sligo & Ashwood, 18th & Ashwood, 18th & Beechwood 6:30 a.m. - 4:30 p.m., Repair sewer main, all lanes are closed, No Emergency traffic Contact: Water & Sewer Department
August 20, 2014 June 30, 2015 Spring St Parking Deck A portion of Spring St and School St will be closed to through traffic near this intersection for the construction of the Spring St Parking Deck.  Detours will be marked. CONTACT: Baldwin and Shell Construction Co. (479) 845-1111
March 31, 2014 June 2015 Van Asche (Garland Avenue to Gregg Avenue)

In general, motorists should anticipate short delays due to the on-going construction work.

CONTACT:  Glenn Newman, City Engineering Division (479) 444-3424
June 10, 2014 September 1, 2014 Van Asche Dr (between McGuire St and Garland Ave) Van Asche Dr (between McGuire St and Garland Ave) will be closed from June 10 - September 1, 7:00am - 5:00pm each day to relocate water and sewer lines.  There will be a flagger for traffic while work is in progress. CONTACT: NEC, Marty Stamps (479) 263-1810
August 15, 2014 September 16, 2014 Weir Rd (between Salem Rd and Howard Nickell Rd) Weir Rd (between Salem Rd and Howard Nickell Rd) will be closed August 15th - September 16th to change the alignment of the street.  Detours will be marked. CONTACT: Fochtman Enterprises, Inc. Earl Fochtman (479) 521-6082