This program maintains the City’s streets to ensure the safest possible travel conditions, free from defects and safety hazards, while providing the most cost-effective
maintenance techniques. Planned services include, but are not limited to crack sealing, pot hole patching, spot surface repairs, asphalt overlays, street cut repairs, repair of sub-base, gravel street maintenance, curb and gutter repair/installation, shoulder repair, street evaluations, stockpiling of materials, guardrail repair/installation, street sweeping and work for other divisions. Approximately 50 miles of pavement marking will be applied during this year. Snow and ice removal as well as storm damage repairs are included in this program. During the winter months, personnel are scheduled 24-hours per day, as needed, to ensure the safest possible travel conditions. This program responds to emergency calls as situations merit.
To better serve the citizens of Fayetteville, the City of Fayetteville Street Program performs ongoing improvements to City streets, curbs and gutters and other drainage structures. All City streets are on a master schedule to be repaved, resurfaced, or receive other special maintenance roughly every 15 years. Streets that experience large amounts of wear may be refinished even sooner. These improvements are scheduled annually according to need and available resources. The current schedule for 2008 has 18 miles of overlay to be installed this year.
If you notice an area of a City street that is in need of improvement, please report it to the Transportation Division. When calling, be prepared with the location and nature of the problem, and with your name and number in case further information is needed.
Our office hours are from 7:30 am to 4:30 pm Monday through Friday. For more information, questions or comments please call (479) 575-8228.