<?xml version="1.0"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>The City of Fayetteville, AR | Cone Patrol</title>
		<link>http://www.accessfayetteville.org/</link>
		<atom:link href="http://www.accessfayetteville.org/xml/cone-patrol-rss.xml" rel="self" type="application/rss+xml" />
		<description>The latest street and lane closings from The City of Fayetteville, Arkansas</description>
		<webMaster>webmaster@ci.fayetteville.ar.us (webmaster)</webMaster>
		<ttl>60</ttl>
		<language>en-us</language>

		<item>
			<title><![CDATA[<STRONG collagebold="true" cmid="conePatrolPage:street">Stonebridge Road</strong> (Between Huntsville Road and Wyman&nbsp; Road)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Stonebridge_Road_%28Between_Huntsville_Road_and_Wyma.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Stonebridge_Road_%28Between_Huntsville_Road_and_Wyma.cfm</guid>
			<description><![CDATA[The Water and Sewer Department will complete a water main repair that requires closing the street to through traffic during work hours, 7:00 a.m. to 4:00 p.m.]]></description>
			<pubDate>Wed, 8 Feb 2012 08:32:41 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG cmid="conePatrolPage:street" collagebold="true">Walnut Avenue</strong> (Sycamore Street to Ash Street)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Walnut_Ave_%28Sycamore_St_to_Ash_St%29.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Walnut_Ave_%28Sycamore_St_to_Ash_St%29.cfm</guid>
			<description><![CDATA[The Water and Sewer Department wil install a water main that requires closing east bound traffic starting at College Avenue and Sycamore Street, continuing&nbsp;thru Walnut Avenue, and ending&nbsp;at Ash&nbsp;Street. The lane will be closed from 8:30 a.m. to 3:30 p.m. daily while work is completed. ]]></description>
			<pubDate>Wed, 1 Feb 2012 09:22:17 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG cmid="conePatrolPage:street" collagebold="true">Sycamore Street </strong>(College Avenue to Walnut Avenue)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/College_to_Ash.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/College_to_Ash.cfm</guid>
			<description><![CDATA[The Water and Sewer Department wil install a water main that requires closing east bound traffic starting at College Avenue and Sycamore Street, continuing&nbsp;thru Walnut Avenue, and ending&nbsp;at Ash&nbsp;Street. The lane will be closed from 8:30 a.m. to 3:30 p.m. daily while work is completed. ]]></description>
			<pubDate>Wed, 1 Feb 2012 09:20:47 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG cmid="conePatrolPage:street" collagebold="true">Ash Street </strong>(Walnut Avenue to 100 feet East)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Ash_Street_%28Walnut_Avenue_to_100_feet_East%29.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Ash_Street_%28Walnut_Avenue_to_100_feet_East%29.cfm</guid>
			<description><![CDATA[The Water and Sewer Department wil install a water main that requires closing east bound traffic starting at College Avenue and Sycamore Street, continuing&nbsp;thru Walnut Avenue, and ending&nbsp;at Ash&nbsp;Street. The lane will be closed from 8:30 a.m. to 3:30 p.m. daily while work is completed. ]]></description>
			<pubDate>Wed, 1 Feb 2012 09:20:06 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG collagebold="true" cmid="conePatrolPage:street">Mountain Street</strong> (Between County Avenue and College Avenue)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Mountain_Street_%28Between_County_Avenue_and_College.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Mountain_Street_%28Between_County_Avenue_and_College.cfm</guid>
			<description><![CDATA[<p class="MsoNormal">Beginning Thursday, January 12, 2012 and extending to February 29, 2012 the City of Fayetteville Transportation Division will begin a street improvement project. The work will include widening and regrading the section of Mountain Street between College Avenue and County Avenue.&nbsp;Scheduled work hours will be 7:00 a.m. until approximately 3:00 p.m. each day. Construction will require closing the street during work hours.&nbsp; The street will be open to regular traffic at night and on weekends. Detour routes will be marked. We regret the inconvenience this may cause, however this will allow needed improvements to be made</p>]]></description>
			<pubDate>Fri, 27 Jan 2012 12:17:42 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG cmid="conePatrolPage:street" collagebold="true">Mission Boulevard</strong> (Between Vandergriff Drive and Starr Drive)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Mission_Boulevard_%28Between_Vandergriff_Drive_and_S.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Mission_Boulevard_%28Between_Vandergriff_Drive_and_S.cfm</guid>
			<description><![CDATA[<p>The City of Fayetteville Transportation Division will begin a project to construct a new 6 foot wide sidewalk along the north side of Mission Boulevard.&nbsp; Phase 1 will make the connection from Vandergriff Drive to Starr Drive.&nbsp; Phase 2 will extend from Starr Drive to Covington Park Boulevard.</p>
<p>Construction equipment will be working along the north side of Mission Boulevard.&nbsp; Trucks will be exiting and entering the roadway in the work area, however traffic disruption will be minimal.</p>
<p>We ask motorists to use caution and be on the look out for workers and equipment when driving through this area.&nbsp; Scheduled work hours will be Monday through Friday from&nbsp;7:00 am until approximately 3:00 pm.</p>]]></description>
			<pubDate>Fri, 27 Jan 2012 12:13:25 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG collagebold="true" cmid="conePatrolPage:street">15th Street </strong>(Between Beechwood Ave and Razorback Road)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/15th_Street_%28Between_Beechwood_Ave_and_Razorback_R.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/15th_Street_%28Between_Beechwood_Ave_and_Razorback_R.cfm</guid>
			<description><![CDATA[<p class="MsoNormal">The City of Fayetteville Transportation Division will begin construction of a new 6 foot wide sidewalk along the north side of 15th Street between Beechwood Avenue and Razorback Road.&nbsp; This project is funded by Federal Transit funds from the Arkansas Highway and Transportation Department to implement New Freedom projects.&nbsp; New Freedom funds are not part of the federal stimulus program. Work will begin Monday, January 30<sup>th</sup> and continue through the end of February 2012.&nbsp; Scheduled work hours will be 7:00 a.m. until approximately 3:30 p.m. each day. The work will require narrowing of traffic lanes during work hours of 7:00 am to 3:30 pm.&nbsp; There will be periods of time when traffic will be restricted to one lane and flag men&nbsp;will be in place to control traffic flow.&nbsp;&nbsp;Please allow extra time&nbsp;and drive slowly through the work area.&nbsp;&nbsp;Please drive with caution and watch for workers and flag men.</p>]]></description>
			<pubDate>Fri, 27 Jan 2012 12:00:45 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG cmid="conePatrolPage:street" collagebold="true">Cato Springs Road</strong> (Between S. School Avenue&nbsp;and Razorback Road)]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Cato_Springs_Rd._%28S._School_Ave._to_Razorback_Rd.%29.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Cato_Springs_Rd._%28S._School_Ave._to_Razorback_Rd.%29.cfm</guid>
			<description><![CDATA[<p>This street is scheduled for full scale improvements, which will include widening, curb and gutter, storm sewer, and drainage improvements.&nbsp; The project is funded by the Transportation Bond Program, as well as Federal Funding through A.H.T.D.</p>
<p>The duration of construction is estimated to be 18 months, weather permitting.&nbsp; Utility companies are scheduled to relocate their facilities first, and the actual road construction will follow soon after that.&nbsp; At this time,&nbsp;power line relocation is occurring, mostly on the&nbsp;north side of the road.&nbsp;No road closures or crossings are scheduled at this time.&nbsp; Motorists are asked to travel with caution.&nbsp; This notice will be updated as warranted.</p>]]></description>
			<pubDate>Thu, 19 Jan 2012 07:36:08 CST</pubDate>
		</item>

		<item>
			<title><![CDATA[<STRONG collagebold="true" cmid="conePatrolPage:street">Intersection of Highway 62 and I-540 (Exit 62)</strong>]]></title>
			<link>http://www.accessfayetteville.org/government/projects/cone_patrol/Hwy_62_and_I-540_Interchange.cfm</link>
			<guid>http://www.accessfayetteville.org/government/projects/cone_patrol/Hwy_62_and_I-540_Interchange.cfm</guid>
			<description><![CDATA[<p>Lane closures are planned Monday, October 31, 2011 through Friday, November 4, 2011 and from Monday, November 7, 2011 through Thursday, November 10, 2011 to allow work related to the placement of the final surfacing and pavement markings on the roadway. </p>
<p>Work on the I-540/Hwy. 62 Interchange includes&nbsp;widening for the addition of auxiliary lanes, relocation of freeway entrance ramps, and intersection radius improvements. The project consists of Grading, Minor Drainage Structures, Aggregate Base Course, ACHM Base, Binder, Surface Courses, Erosion Control Items, and other miscellaneous items.</p>]]></description>
			<pubDate>Wed, 2 Nov 2011 08:17:59 CDT</pubDate>
		</item>

	</channel>
</rss>

